In this unit, you are required to complete the Project Schedule section of the project plan. Refer to your unit
lesson (from this unit and last unit) and required unit resources to advance your project plan. For this
assignment, create the components listed below.
Project Schedule: Include the duration estimates for all project activities, their activity networks, the project
critical path, and estimated project duration.
4.1 Activity Duration Estimates: Include a table with activity number, activity, predecessors, optimistic
duration, most likely duration, pessimistic duration, and estimated duration. Be sure to show your paths as
well as the critical path.
4.2 Gantt Chart: Show the task, duration, predecessors, and the schedule leveling.
4.3 Activity Network: Be sure to include fully completed nodes, including early start, early finish, late start,
late finish, and activity float/slack.
This assignment should be a minimum of two pages in length, not counting the title page and reference
page. Be sure to use proper APA formatting. Citations are not required; however, if outside sources are
used, make certain to provide in-text citations and references in APA format. For more elaboration on what
you should include in your project plan, refer to pp. 539–542 in your textbook.